It may not seem like much but this was a TON of work! Ended up taking all day. Electricity was moved around to make 2 plugs from two different circuits and one light from an even different circuit. Plumbing also had to be figured and a drain. That all seems simple but it was a lot of figuring and planning 3 steps ahead to make sure it would all fit. Plugs had to fit in to make sure that the mirror and lights would fit. Drain had to be at the right height. Plumbing had to be able to run into our hot water tank and then back out. Man oh Man! But in the end, the back wall has drywall and insulation and is FINISHED!!! Of course the other walls now need insulation and drywall but that will be much easier. Then we will finish the drywall, paint, and be ready for the counter and sink. Bathroom finished!!!! But I am getting ahead of myself, at the rate we work it might be done in a month or so!!!